Keep the later result visible
The 7 October work report documented a paid partial shift and no promotion in that window. The reviewed 8 October observation later completed a full shift and recorded the first promotion.
The older guide remains a historical report. Its statement that a full shift was not yet completed describes its own evidence cutoff, not a claim that promotion has never happened.
Read one result per window
Use the starting rank, completion state and checked date to understand the sequence. A later success does not turn the earlier partial shift into a failed full shift.
| Checked window | Recorded result | Unresolved by that window |
|---|---|---|
| 7 October partial shift | 2,900 paid; performance 80% → 90%; role unchanged | Full settlement and promotion |
| 8 October completed shift | 11,600 paid; Marketer Level 1 → Relationship Officer Level 2 | Guaranteed shifts to promotion |
| Later rank menu | 21,000 pay label; Branch Manager requirements shown | A subsequent received wage or promotion |
Check the latest relevant evidence
Start with the current panel when planning your own run. The published archive is useful for context, while the newer Banking note helps interpret an older “not yet verified” sentence.
Why this is not a speed benchmark
The full-shift observation began at 90% performance, while the partial-shift observation had a different starting state and an early departure. They are not matched work-mode comparisons.
A performance cap can also hide differences between modes. Neither window established the exact daily reset, a fastest career route or the number of shifts to maximum rank.
What about the successful save check?
The promoted title and income matched after one reload in the later run. That confirms this retained result; it does not explain the separate older laptop rollback.
Does the next wage label revise the receipt? No. A new role’s displayed 21,000 belongs to a future shift offer, while the completed run’s receipt remains 11,600.
Sources & dates
Check what each source records. A menu label and a completed playtest are different kinds of evidence.
- dated public guide7 October work and partial-settlement field report 7 Oct 2026
- dated public guide7 October promotion-priority field report 7 Oct 2026
- dated playtestIndependent Banking observation · 8 October 2026 8 Oct 2026